Technimove led the audit, relocation, and upgrade of a financial client’s WAP infrastructure across two London sites. Delivered in phases with secure handling, Arista installs, and structured cabling—ensuring zero disruption and expert execution.

Seamless network upgrades and relocations, executed with precision, security, and zero operational disruption.

Background

Since 1998, Technimove has supported organisations across all sectors with reliable and strategic data centre transformation. On this occasion, our client required expert Networking and Data Centre support to relocate and upgrade their Wireless Access Point (WAP) infrastructure between two London locations, as part of a wider programme of IT improvements. Given the critical nature of the equipment, the work needed to be delivered to strict timelines with minimal operational disruption.

 

Client Requirement

The project was delivered in two stages. The first involved auditing and relocating the client’s existing WAPs from one site to another, with full decommissioning and recommissioning. The second stage focused on removing legacy WAPs and installing new Arista devices.

Work was scheduled within specific weekday and Saturday access windows, ensuring it aligned with the client’s business hours and reduced the risk of operational impact. Clear documentation, secure handling, and precise coordination were all essential to the success of the project.

 

Our Solution

Planning and Coordination

Our Project Management Team worked closely with the client from the outset, ensuring all details were aligned ahead of delivery. We reviewed and verified rack layouts, patching schedules and equipment lists, providing clarity at each stage of planning.

A tailored migration runbook was developed to support the delivery process, supported by regular meetings and update calls with key stakeholders. This ensured that any challenges were addressed promptly and that all parties remained fully informed throughout.

Phase One: Audit and Equipment Relocation

The initial phase began with a physical audit of all WAPs on the 16th floor of the client’s data centre. Our engineers identified eight active devices, tracing each patch cable from switch port to patch panel and confirming their positions. Where necessary, WAPs were temporarily removed and reinstalled to confirm location details.

Once the audit was complete, our team returned on the agreed migration date. The client powered down systems ahead of our arrival. We decommissioned and labelled all equipment in line with the agreed destination rack plans. Each device was then wrapped in anti-static material and placed in foam-lined flight cases, along with a bag of optics.

Items were transported in one of our GPS-tracked vehicles, with security tags and equipment itineraries used where requested. On arrival at the new location, our engineers unpacked and installed all equipment according to plan. Structured cabling was completed using the client’s existing cables, and each device was labelled as specified. Final power-up and testing were completed by the client.

Phase Two: Wireless Access Point Replacement

The second phase focused on upgrading the WAPs. Our engineers located the new Arista devices, labelled them according to the client’s instructions, and removed the existing WAPs. The new units were mounted using the brackets already in place.

Once installation was complete, the equipment was handed over to the client for testing.

 

Outcome

All works were completed within the defined access windows and without disruption to business operations. The relocation and upgrade were delivered according to plan, with strong coordination and a structured approach ensuring all requirements were met.

This project reflects our ongoing commitment to careful planning, technical precision, and clear communication—helping our clients carry out infrastructure improvements with confidence and control.

 

Why Technimove?

Organisations choose Technimove because we combine proven delivery with a strategic mindset. From single-site upgrades to global data centre estate transformations, we’ve built a reputation on experience, flexibility, and trust.

Expertise Built Over Decades

With over 25 years in the industry and thousands of successful projects completed worldwide, our team understands how to manage critical infrastructure under pressure and without compromise.

Specialist Project Management

Our dedicated project managers bring structure and foresight to every stage of delivery. They work closely with clients to reduce risk, maintain visibility, and ensure that nothing is left to chance.

End-to-End Control

From the initial audit to final installation, we handle every detail—equipment handling, secure transportation, rack installation, cabling, and documentation—so clients can stay focused on the bigger picture.

Secure and Reliable

All migrations are supported by GPS-tracked vehicles, security tagging, and tightly controlled handovers, giving clients complete reassurance throughout the process.

Future-Focused Transformation

Our work is about more than moving infrastructure—it’s about enabling progress. Every solution is designed to support long-term goals, helping clients adapt to change and build stronger foundations for the future.

 

Looking to upgrade or relocate your network infrastructure?

Speak to Technimove’s experts today and discover how our industry-leading audit, migration, and project management services can support your transformation goals.

Contact Us or Learn More about our IT Professional Services here.

START HERE

We’re the experts, ask us anything, we’ll find the answer.
CONTACT US