Data Centre Transformation & IT Asset Disposal for a Leading Alternative Investment Manager

This case study outlines the project's requirements, proposed solutions, and the outcomes achieved, including comprehensive project management, meticulous physical audits, and secure ITAD services.

Data Centre Transformation & IT Asset Disposal for a Leading Alternative Manager

Background

As a leader in technology-based Data Centre transformation solutions since 1998, we were engaged by CDW to provide specialist Migration and IT Asset Disposal (ITAD) services for a leading alternative investment manager. With over 25 years of experience, we offer expert services and have a proven track record of delivering successful projects for clients of all sizes. This case study outlines the project’s requirements, proposed solutions, and the outcomes achieved.

Challenge

The client required a comprehensive solution to migrate their data centre equipment between two locations and securely dispose of redundant hardware. The project involved two primary requirements:

  1. Physical Migration: Moving equipment between two locations.
  2. ITAD Services: Onsite shredding and secure disposal of redundant hardware in compliance with WEEE regulations.

Solution

Project Management

We provided comprehensive project management services, ensuring a seamless transition with minimal risk and downtime. Our project management team was responsible for:

  • Verifying equipment lists, rack layouts, and patching schedules.
  • Delivering logistical planning using migration runbooks.
  • Coordinating with client teams to address strategic hurdles and provide best practice advice.

Our team of IT relocation specialists have extensive knowledge of IT hardware, data centre migrations, and other IT infrastructure projects. Our expertise and commitment to excellence efficiently and effectively managed the project from start to finish, ensuring a clear audit trail and chain of custody.

Learn More about our Project Management-as-a-Service here.

Physical Audit

To ensure accuracy and minimise risk, we conducted a thorough physical audit of the existing infrastructure. This included:

  • Documenting rack and device details.
  • Recording serial numbers and port configurations.
  • Labeling dedicated cables for reuse at the destination site.

We employ industry best practices to minimise the risk of downtime and data loss during the relocation process. Our meticulous approach to physical audits accurately documented and prepared all equipment for migration, ensuring secure data erasure and asset disposition.

Learn More about our Physical Data Centre Audit Services here.

Cable Tracing and Pre-Cabling

We traced network cables and pre-cabled the destination site to streamline the migration process. This involved:

  • Installing and labeling copper and fiber cables.
  • Managing cables to the correct U position in line with destination rack plans and patching schedules.
  • Implementing a change freeze post pre-cabling to minimise risk.

We used state-of-the-art equipment and technology to complete the pre-cabling process efficiently and to the highest standards. Our flexibility in offering tailored solutions met the unique needs of the client.

Learn More about our Structured Cabling Services here.

Physical Migration

On the day of the migration, we executed a meticulous decommission to recommission solution:

  • Decommissioning and Labeling: Our engineers decommissioned and labeled all devices required for migration in line with the destination rack plans. This step ensured that each piece of equipment was correctly identified and prepared for transport.
  • Packing: Equipment was carefully packed using anti-static bubble wrap and placed into purpose-built, foam-lined server flight cases. Rail kits associated with the migration were also labeled and packed in foam-lined rail kit flight cases.
  • Transportation: The packed equipment was loaded onto GPS-tracked, solid-sided vehicles. For added security, flight cases could be security tagged and sealed, with the onsite client contact signing an equipment itinerary to confirm secure packing.
  • Unloading and Installation: Upon arrival at the destination site, our team unloaded the flight cases and moved them into position within the new facility. The equipment was then unpacked and installed according to the destination rack plans. Devices were recommissioned in line with the pre-cabled racks and patching schedules provided.

Our efficiency and commitment to excellence ensured that the physical migration was completed on time and on budget. Our risk reduction strategies minimised the potential for downtime and data loss during the relocation process.

Learn More about our Data Centre Migration Services here.

Post-Commissioning Support

We provided post-commissioning support to ensure a smooth transition. This included:

  • Onsite assistance for up to six hours to address any last-minute changes or issues.
  • Troubleshooting and replacing cables as needed.

Our dedication to delivering world-class, people-powered solutions was evident in our post-commissioning support. Our team of industry experts provided knowledgeable assistance and assurance, ensuring the client’s peace of mind.

IT Asset Disposal Recycling & Disposal

We handled the secure disposal of redundant hardware, adhering to the highest standards of data security and environmental responsibility. The process included:

  • Onsite shredding of 221 hard disk drives.
  • Relocating redundant hardware to our secure disposal facility.
  • Providing a Certificate of Disposal upon completion.

Our commitment to environmental responsibility and data security ensured that all redundant hardware was disposed of in compliance with WEEE regulations. Our secure disposal process provided the client with a Certificate of Disposal, confirming that all data-bearing devices were securely destroyed.

Learn More about our IT Asset Disposal Service here.

Outcome

Our expertise in managing complex data centre transformations was evident in the successful completion of this project for the client. By providing comprehensive project management, meticulous physical audits, and secure ITAD services, we ensured minimal downtime and maximum data security. This case study highlights our commitment to delivering high-quality, future-proof solutions that meet the strategic goals of our clients.

 

Why Technimove?

Technimove were chosen by the client due to our proven track record in delivering complex migrations with minimal risk and disruption.

With a highly structured approach, we provided thorough pre-migration planning, expert project management, and secure IT asset handling, ensuring a seamless transition.

Our ability to adapt to their specific operational needs, combined with meticulous attention to security and compliance, gave them confidence that their critical infrastructure was in safe hands.

By leveraging our experience, precision, and end-to-end support, the client successfully achieved their transformation goals while maintaining business continuity.

 

Transform Your Data Centre with Technimove

Discover how Technimove’s expert data centre transformation solutions can benefit your organisation. With over 25 years of experience, we offer comprehensive services including migration, IT asset disposal, and secure data destruction. Our meticulous approach ensures minimal downtime, maximum data security, and compliance with industry standards.

Join the likes of 8×8, University College London, Warwick University, and PokerStars in transforming your data centre with Technimove.

Contact us today to learn more about our cost-effective solutions and how we can help you achieve your strategic goals. Let’s secure your sensitive data and streamline your data centre operations from start to finish.

START HERE

We’re the experts, ask us anything, we’ll find the answer.
CONTACT US